It has been 3 months since Milton, left overs POST FOUND IN DRAFTS since Dec 11
It has been 8 weeks today, since Hurricane Milton Kicked us in to chaos and we are mostly back to normal. I found these photo that had not been posted, consider this the anniversary Photo Dump
These are photos of the trash Bob dug out of the pool. He was scooping it out and I was dragging it to the front curb, he would throw it on the deck. I dragged a big garbage can to the side of the pool and said fill the can and I will drag it to the curb, dumping it on the deck is double work.
the next photos you can't see what is under the water because the water was green and dark
The Pool was full to the top, it is 5 feet deep on one end and 10 on the other.
It took bob 3 days to get it to what you see below
and the pile to the front of below photo is what he dragged out of the pool, and I dragged to the curb.
4 comments:
Wat hard work! I love your new 3-D header!!
That looks backbreaking and must be a relief to get it all done. I expect you have a lot more to do? I hope not though. And as Ginny said, I like your new header also.
I’m so glad all that work is over! ❤️
Oh my what a lot of work for a pair of oldies. I don't know how you did it. Well done. Hope you don't get another one any time soon.
Post a Comment